Caption text Caption text Caption text Caption text

Construction

Overseas Passenger Terminal Extension - Circular Quay

Client: Port Authority of NSW
Capabilities: Construction, Sheet Piling
Region: Circular Quay (New South Wales)
Completed: November 2014

Design & Construction of a High Profile Wharf on a Fast-Track Program.

Swansea Bridge Fender Replacement

Client: RMS - RCS Hunter Project
Capabilities: Construction, Piling, Bridges
Region: Sydney (New South Wales)
Completed: September 2013

Project scope included the installation of piles and the fabrication and installation of the steel fender systems.

Materials Offloading Facility

Client: Bechtel
Capabilities: Construction, Sheet Piling
Region: Gladstone (Queensland)
Completed: December 2012

Waterway Constructions has designed and constructed a Materials Offloading Facility in Gladstone, Queensland. The work involved the design and construction of a Roll-on Roll-off (Ro-Ro) and Lift-on Lift-off (Lo-Lo) wharf which is within Gladstone Harbour.

Reconstruction of flood damaged ferry wharves, Brisbane

Client: Brisbane City Council
Capabilities: Construction, Piling, Pontoons
Region: Brisbane River (Queensland)
Completed: April 2011

Repair and reinstatement of six Brisbane River ferry terminals damaged by the January 2011 floods

BHP Sheetpile Wall

Client: BHP Billiton
Capabilities: Construction, Sheet Piling
Region: Newcastle (New South Wales)
Completed: April 2011

Construction of an 880m long in-river sheet pile wall to contain contaminated sediments. Sheet piles up to 28m long were vibrated through very dense sands using four floating crane rigs and a 550 tonne land based crane.

Yarra River Sewer Crossing

Client: John Holland
Capabilities: Construction, Sheet Piling, Pipelines
Region: Melbourne (Victoria)
Completed: February 2011

The project consisted of replacing the Melbourne Main Sewer, from Port Melbourne to Docklands. The river crossing was installed inside a wet cofferdam in three stages to minimise disruption to river traffic. The pipe was installed underwater in 5m, 10m and 20m sections. Sheet pile cofferdams were installed at each end to allow access shafts to be constructed.

Milsons Point Wharf Upgrade

Client: Hansen Yunken
Capabilities: Construction, Piling, Pontoons, Demolition
Region: Sydney (New South Wales)
Completed: November 2010

The project involved the demolition of the existing timber Milsons Point Wharf and the construction of a new steel and concrete wharf with a hydraulic loading platform.

Iron Cove Bridge

Client: Baulderstone
Capabilities: Construction, Piling, Bridges
Region: Sydney (New South Wales)
Completed: March 2010

Installation of 64 vertical and raking 790mm piles for 6 pile caps with piles vibrated and/or driven into the sandstone. Pile caps were constructed as pre-cast shells with insitu concrete infill.