Client: Brisbane City Council Capabilities:Construction, Piling Region: Brisbane River (Queensland)
Repair and reinstatement of six Brisbane River ferry terminals damaged by the January 2011 floods
MORE >
Client: BHP Billiton Capabilities:Piling, Sheet Piling Region: Newcastle (New South Wales)
Construction of an 880m long in-river sheet pile wall to contain contaminated sediments. Sheet piles up to 28m long were vibrated through very dense sands using four floating crane rigs and a 550 tonne land based crane.
MORE >
Client: John Holland Capabilities:Sheet Piling, Pipelines Region: Melbourne (Victoria)
Construction of a 2m pipeline across the Yarra River using a wet sheetpile coffer technique undertaken in three stages across the river.
MORE >
Client: Sydney Ferries Capabilities:Maintenance Region: Sydney (New South Wales)
Structural refurbishment of Jetties 1 & 2 including services, timber substructure timber piles and decking together with the construction of a new concrete hardstand on steel tube piles.